Engagement process

From the first drawing to long-term service — we stay on the project.

Most suppliers hand off a product and disappear. We carry the technical load through six stages, so design intent survives all the way to installed performance.

01

Design consultation

Early collaboration during the design phase to support system direction and concept engineering — before the details are locked.

02

Quote

One number you can trust: every quote is checked for technical feasibility before it reaches you, so the price at signature is the price that survives engineering.

03

Engineering & shop drawings

Every dimension, finish, and site condition confirmed with you before anything is released to the factory. Then full in-house engineering to EN and ASTM standards, stamped shop drawings, and a certification package for the permitting authority.

04

Custom manufacturing in Germany

Built to the millimeter and factory pre-finished — every edge, inside and out. No field-applied finishes, which is what makes the warranty possible.

05

Delivery & certified installation

Customs-cleared and timed to your construction schedule, then installed by our own Germany-trained crews — never subcontracted — and signed off through a final quality inspection.

06

Warranty & service

A documented handover, a ten-year transferable warranty, and annual servicing for the life of the building — hardware adjusted, gaskets conditioned, records kept.

After the install

Installation, warranty, and service — the part most suppliers leave to someone else.

InstallationPerformed exclusively by our own Germany-trained crews. Three documented controls — delivery, installation, and final quality inspection — because a coastal certification is only as good as the installation behind it.
WarrantyTen-year full-replacement warranty covering materials, workmanship, hardware, and finishes — possible because every unit is finished completely in the factory. Fully transferable with the home.
ServiceAn annual service program run by the same organization that engineered and installed the units: hardware adjustment, gasket conditioning, drainage checks, factory-direct parts, and documented service records that matter at resale.
Bring us in early

The best outcomes happen when fenestration is considered at the earliest design phases — not value-engineered in at the end.

AIA CE lunch-and-learnProject referencesDesign consultationTechnical drawings
Process

Start at the drawing stage.

Book a design consultation